VIP Structural Steel Projects
Welcome to the VIP Structural Steel project page where we showcase different projects we have completed or currently have underway. We pride ourselves on working closely with the lead contractors for each site.
Click on the projects below to see some of the progress shots and to find out more information.
Our residential division recently completed structural steel on this architectural 2 storey seaside home in Redcliffs.
Some quick information – building area = 223m2. Under a week to erect our steel. We had a 25t crane onsite and used for the main lifts and our spider crane used for the smaller lifts in the tight spots. There are 5 main portals which add up to approximately 8t of structural steel in this home.
This project was completed on the busiest road leading into Sumner and our team performed the job safely and efficiently with minimal disturbance to traffic.
Some recent and early pictures from our structural steel works at the new Earth & Sky – Observatory in Lake Tekapo, New Zealand!
At the end of this job we utilised our spider crane – perfect for getting into areas where there is no access for a crane or manitou.
We had Stunning views of the lake for the 6-8 months we were here completing the different parts of the structural steel.
We’ve been busy installing a new lift shaft to an existing building that will be converted into motel/apartments.
The lift shaft was fabricated at our Bromley workshop then delivered and assembled on site.
Once ready it was lifted into place in two lifts to create a 7 storey lift shaft.
Once completed this will eventually be enclosed including the stairway on the left of it which we are also strengthening for seismic movement.
We have also completed some structural steel in the basement to allow for a 7 story extension to be constructed above.
We are also completing the roof steel for this extension.
Steel Info = Structural steel completed in 3 stages, installed floor by floor with a total steel weight of 100 tonne.
Client = Armitage Williams Construction Limited.
Project = Arvida Group – Living Well Apartments, Park Lane Retirement Village, Tower Junction, Christchurch.
35m steel truss frame being lifted into place with our 75t crane! These were fabricated in 3 pieces and then delivered and assembled on site.
In total we had 150t of steel erected safely in 3 weeks.
Structural Steel completed for this architectural home in Christchurch.
Structural Steel provides innovative solutions where timber framing or trusses won’t meet the structural requirements.
A very large extension we are completing for Haydn Brush in Rolleston, Christchurch.
The two buildings will eventually be joined to create one long warehouse.
Another successful job completed at Cotswold School in Christchurch, New Zealand. This job also included a retrofit to the porta building.
Breens Primary School completed early 2019. Awesome job by our team.
The new Freeman Ball facility on Braeburn Drive, Christchurch. Completed early 2019.
The new Autohub facility in Waterloo Business Park Christchurch.
Location; Woolston, Christchurch
Description; A recently finished public project called the Woolston Community Library. This architectural build features a lot of our exposed steel beams and the finished result looks amazing.
Location; Kaiapoi, North Canterbury
Location: Rangiora, North Canterbury
Location: Super lot 7, East Frame, Christchurch
Type of dwelling: Apartment
Number of dwellings: 85
Location: QE2 Park, Avondale, Christchurch
Description: New facility for the Christchurch School Of Gymnastics.
Location: Peterborough St, Christchurch Central, Christchurch.
Location: Islington, Christchurch