VIP Structural Steel Projects

Welcome to the VIP Structural Steel project page where we showcase different projects we have completed or currently have underway. We pride ourselves on working closely with the lead contractors for each site.

Click on the projects below to see some of the progress shots and to find out more information.

  • Rocking Horse Rd
    Rocking Horse Rd
  • Ag Research Lincoln
    Ag Research Lincoln
  • Rodin Cars
    Rodin Cars
  • JK Warehouse
    JK Warehouse
  • Linwood College
    Linwood College
  • Christchurch Fire Station – Staircase
    Christchurch Fire Station – Staircase
  • Christ Church Cathedral 2022
    Christ Church Cathedral 2022
  • Christ Church Cathedral 2020 – 2021
    Christ Church Cathedral 2020 – 2021
  • Glenelg Spur
    Glenelg Spur
  • Waterloo Rd
    Waterloo Rd
  • Colombo St Hotel
    Colombo St Hotel
  • Spec 6 Airport
    Spec 6 Airport
  • Christchurch Boys High School
    Christchurch Boys High School
  • Gold Pine Nelson
    Gold Pine Nelson
  • Windermere Retirement Village
    Windermere Retirement Village
  • FMG building
    FMG building
  • Avenger Cresent, Christchurch
    Avenger Cresent, Christchurch
  • 177 High Street, Christchurch Central City
    177 High Street, Christchurch Central City
  • Prison Walkway & Structural Steel
    Prison Walkway & Structural Steel
  • Silverstream – Residential Structural Steel
    Silverstream – Residential Structural Steel
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_1
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_1
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_54
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_54
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_74
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_74
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_53
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_53
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_106
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_106
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_34
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_34
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_72
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_72
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_80
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_80
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_85
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_85
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_144
VIP_steel_rocking_horse_road_final_stage_29.07.22_small_144
Rocking Horse Rd

This is our project at Rocking Horse Road with T and A Construction, designed by Three Sixty Architecture and Ruamoko Solutions.

Dean Cowell (homeowner/architect) has done an amazing job in designing this beautiful home and we were glad to be involved with the structural steel & metalwork on this project.

VIP_steel_lincoln_ag_research_01.08.22_small_19
VIP_steel_lincoln_ag_research_01.08.22_small_19
VIP_steel_lincoln_ag_research_01.08.22_small_69
VIP_steel_lincoln_ag_research_01.08.22_small_69
VIP_steel_lincoln_ag_research_01.08.22_small_21
VIP_steel_lincoln_ag_research_01.08.22_small_21
VIP_steel_lincoln_ag_research_01.08.22_small_24
VIP_steel_lincoln_ag_research_01.08.22_small_24
VIP_steel_lincoln_ag_research_01.08.22_small_27
VIP_steel_lincoln_ag_research_01.08.22_small_27
VIP_steel_lincoln_ag_research_01.08.22_small_28
VIP_steel_lincoln_ag_research_01.08.22_small_28
VIP_steel_lincoln_ag_research_01.08.22_small_39
VIP_steel_lincoln_ag_research_01.08.22_small_39
VIP_steel_lincoln_ag_research_01.08.22_small_45
VIP_steel_lincoln_ag_research_01.08.22_small_45
VIP_steel_lincoln_ag_research_01.08.22_small_56
VIP_steel_lincoln_ag_research_01.08.22_small_56
VIP_steel_lincoln_ag_research_01.08.22_small_63
VIP_steel_lincoln_ag_research_01.08.22_small_63
VIP_steel_lincoln_ag_research_01.08.22_small_21
VIP_steel_lincoln_ag_research_01.08.22_small_21
Ag Research Lincoln

AG Research Lincoln project for Naylor Love Construction

vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_0
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_0
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_1
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_1
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_2
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_2
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_3
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_3
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_4
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_4
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_5
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_5
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_6
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_6
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_7
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_7
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_8
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_8
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_9
vip_steel_christchurch_north_canterbury_rodin_cars_superstructure_9
Rodin Cars

2500m2 Superstructure at the new Rodin Cars factory in Waiau.

vip_steel_christchurch_jamie_kay_warehouse_0
vip_steel_christchurch_jamie_kay_warehouse_0
vip_steel_christchurch_jamie_kay_warehouse_1
vip_steel_christchurch_jamie_kay_warehouse_1
vip_steel_christchurch_jamie_kay_warehouse_2
vip_steel_christchurch_jamie_kay_warehouse_2
vip_steel_christchurch_jamie_kay_warehouse_3
vip_steel_christchurch_jamie_kay_warehouse_3
vip_steel_christchurch_jamie_kay_warehouse_4
vip_steel_christchurch_jamie_kay_warehouse_4
vip_steel_christchurch_jamie_kay_warehouse_5
vip_steel_christchurch_jamie_kay_warehouse_5
vip_steel_christchurch_jamie_kay_warehouse_6
vip_steel_christchurch_jamie_kay_warehouse_6
vip_steel_christchurch_jamie_kay_warehouse_7
vip_steel_christchurch_jamie_kay_warehouse_7
vip_steel_christchurch_jamie_kay_warehouse_8
vip_steel_christchurch_jamie_kay_warehouse_8
vip_steel_christchurch_jamie_kay_warehouse_9
vip_steel_christchurch_jamie_kay_warehouse_9
vip_steel_christchurch_jamie_kay_warehouse_10
vip_steel_christchurch_jamie_kay_warehouse_10
vip_steel_christchurch_jamie_kay_warehouse_11
vip_steel_christchurch_jamie_kay_warehouse_11
JK Warehouse

3500m2 warehouse development for BG Cooke in Waterloo Business Park.

linwood_college_vip_structural_steel_1:3:21_small_18
linwood_college_vip_structural_steel_1:3:21_small_18
linwood_college_vip_structural_steel_1:3:21_small_32
linwood_college_vip_structural_steel_1:3:21_small_32
linwood_college_vip_structural_steel_1:3:21_small_35
linwood_college_vip_structural_steel_1:3:21_small_35
linwood_college_vip_structural_steel_1:3:21_small_58
linwood_college_vip_structural_steel_1:3:21_small_58
vip_steel_linwood_college_9:11:20_small_145
vip_steel_linwood_college_9:11:20_small_145
vip_steel_linwood_college_9:11:20_small_148
vip_steel_linwood_college_9:11:20_small_148
vip_steel_linwood_college_9:11:20_small_149
vip_steel_linwood_college_9:11:20_small_149
vip_steel_linwood_college_9:11:20_small_150
vip_steel_linwood_college_9:11:20_small_150
vip_steel_linwood_college_9:11:20_small_170
vip_steel_linwood_college_9:11:20_small_170
vip_structural_steel_linwood_college_23:4:21_small_38
vip_structural_steel_linwood_college_23:4:21_small_38
vip_structural_steel_linwood_college_23:4:21_small_53
vip_structural_steel_linwood_college_23:4:21_small_53
vip_structural_steel_linwood_college_23:4:21_small_67
vip_structural_steel_linwood_college_23:4:21_small_67
vip_structural_steel_linwood_college_23:4:21_small_95
vip_structural_steel_linwood_college_23:4:21_small_95
vip_structural_steel_linwood_college_23:4:21_small_100
vip_structural_steel_linwood_college_23:4:21_small_100
Linwood College

A total of 587t was installed over 10 months. The Linwood College Rebuild is one of the biggest Ministry of Education projects in the South Island. A brilliant effort from all that were involved.

VIP_steel_13.09.21_small_27_christchruch_fire_station
VIP_steel_13.09.21_small_27_christchruch_fire_station
VIP_steel_13.09.21_small_37_christchruch_fire_station
VIP_steel_13.09.21_small_37_christchruch_fire_station
VIP_steel_13.09.21_small_39_christchruch_fire_station
VIP_steel_13.09.21_small_39_christchruch_fire_station
VIP_steel_13.09.21_small_51_christchruch_fire_station
VIP_steel_13.09.21_small_51_christchruch_fire_station
VIP_steel_13.09.21_small_54_christchruch_fire_station
VIP_steel_13.09.21_small_54_christchruch_fire_station
VIP_steel_13.09.21_small_56_christchruch_fire_station
VIP_steel_13.09.21_small_56_christchruch_fire_station
VIP_steel_13.09.21_small_65_christchruch_fire_station
VIP_steel_13.09.21_small_65_christchruch_fire_station
VIP_steel_13.09.21_small_67_christchruch_fire_station
VIP_steel_13.09.21_small_67_christchruch_fire_station
VIP_steel_13.09.21_small_70_christchruch_fire_station
VIP_steel_13.09.21_small_70_christchruch_fire_station
VIP_steel_13.09.21_small_75_christchruch_fire_station
VIP_steel_13.09.21_small_75_christchruch_fire_station
vip_metal_work_christchurch_fire_station_30_3_22_small_37
vip_metal_work_christchurch_fire_station_30_3_22_small_37
vip_metal_work_christchurch_fire_station_30_3_22_small_216
vip_metal_work_christchurch_fire_station_30_3_22_small_216
vip_metal_work_christchurch_fire_station_30_3_22_small_231
vip_metal_work_christchurch_fire_station_30_3_22_small_231
vip_metal_work_christchurch_fire_station_30_3_22_small_171
vip_metal_work_christchurch_fire_station_30_3_22_small_171
vip_metal_work_christchurch_fire_station_30_3_22_small_157
vip_metal_work_christchurch_fire_station_30_3_22_small_157
vip_metal_work_christchurch_fire_station_30_3_22_small_103
vip_metal_work_christchurch_fire_station_30_3_22_small_103
vip_metal_work_christchurch_fire_station_30_3_22_small_79
vip_metal_work_christchurch_fire_station_30_3_22_small_79
vip_metal_work_christchurch_fire_station_30_3_22_small_71
vip_metal_work_christchurch_fire_station_30_3_22_small_71
vip_metal_work_christchurch_fire_station_30_3_22_small_65
vip_metal_work_christchurch_fire_station_30_3_22_small_65
vip_metal_work_christchurch_fire_station_30_3_22_small_62
vip_metal_work_christchurch_fire_station_30_3_22_small_62
vip_metal_work_christchurch_fire_station_30_3_22_small_58
vip_metal_work_christchurch_fire_station_30_3_22_small_58
Christchurch Fire Station – Staircase

Christchurch City Fire Station with Cook Brothers Construction. The frames for the tower were fabricated and welded in our workshop and then brought to site to install. A great job by the team.

vip_steel_christ_church_cathedral_first_roof_frame_lift_9_3_22_small_18
vip_steel_christ_church_cathedral_first_roof_frame_lift_9_3_22_small_18
vip_steel_christ_church_cathedral_day_03_11_3_22_small_7
vip_steel_christ_church_cathedral_day_03_11_3_22_small_7
vip_steel_christ_church_cathedral_first_roof_frame_lift_9_3_22_small_89
vip_steel_christ_church_cathedral_first_roof_frame_lift_9_3_22_small_89
VIP_steel_cathedral_photos_aps_preparation_6.5.22_small_72
VIP_steel_cathedral_photos_aps_preparation_6.5.22_small_72
VIP_steel_cathedral_early_morning_delivery_25:05:22_small_2
VIP_steel_cathedral_early_morning_delivery_25:05:22_small_2
VIP_steel_cathedral_rolling_frame_and_setting_up_crane_25:05:22_small_32
VIP_steel_cathedral_rolling_frame_and_setting_up_crane_25:05:22_small_32
VIP_steel_cathedral_lifting_apse_frame_25:05:22_small_7
VIP_steel_cathedral_lifting_apse_frame_25:05:22_small_7
VIP_steel_cathedral_final_Interview_and_flyover_29.07.22_small_1
VIP_steel_cathedral_final_Interview_and_flyover_29.07.22_small_1
VIP_steel_cathedral_final_Interview_and_flyover_29.07.22_small_5
VIP_steel_cathedral_final_Interview_and_flyover_29.07.22_small_5
VIP_steel_cathedral_final_Interview_and_flyover_29.07.22_small_8
VIP_steel_cathedral_final_Interview_and_flyover_29.07.22_small_8
VIP_steel_cathedral_final_Interview_and_flyover_29.07.22_small_15
VIP_steel_cathedral_final_Interview_and_flyover_29.07.22_small_15
VIP_steel_cathedral_final_Interview_and_flyover_29.07.22_small_62
VIP_steel_cathedral_final_Interview_and_flyover_29.07.22_small_62
Christ Church Cathedral 2022

North & South Nave Aisle Walls
Lateral bracing element, part of it becomes a permanent fixture.

East Apse
Major bracing structure on the Eastern end of the structure.

Crossing
Sliding structure to provide roof top access to the building.

vip_steel_cathedral__steel_delivery_19:10:20_small_42
vip_steel_cathedral__steel_delivery_19:10:20_small_42
vip_steel_cathedral_site_measure_26:8:20_small_33
vip_steel_cathedral_site_measure_26:8:20_small_33
vip_steel_cathedral_site_measure_26:8:20_small_36
vip_steel_cathedral_site_measure_26:8:20_small_36
vip_steel_cathedral_site_measure_26:8:20_small_40
vip_steel_cathedral_site_measure_26:8:20_small_40
vip_steel_cathedral_west_wall_install_17:12:20_small_5
vip_steel_cathedral_west_wall_install_17:12:20_small_5
vip_steel_cathedral_west_wall_install_17:12:20_small_37
vip_steel_cathedral_west_wall_install_17:12:20_small_37
vip_steel_cathedral_west_wall_install_17:12:20_small_39
vip_steel_cathedral_west_wall_install_17:12:20_small_39
vip_steel_cathedral_west_wall_install_17:12:20_small_43
vip_steel_cathedral_west_wall_install_17:12:20_small_43
vip_steel_cathedral_west_wall_install_17:12:20_small_53
vip_steel_cathedral_west_wall_install_17:12:20_small_53
vip_steel_cathedral_west_wall_install_17:12:20_small_81
vip_steel_cathedral_west_wall_install_17:12:20_small_81
vip_steel_christchurch_cathedral_south_wall_frame_23:10:20_small_53
vip_steel_christchurch_cathedral_south_wall_frame_23:10:20_small_53
vip_steel_christchurch_cathedral_south_wall_frame_23:10:20_small_54
vip_steel_christchurch_cathedral_south_wall_frame_23:10:20_small_54
Christ Church Cathedral 2020 – 2021

We’re proud to be working on such an iconic project in the heart of Christchurch City – the Christ Church Cathedral Reinstatement!

The key stages are:
1. Pre-construction
2. Cathedral Stabilisation – (current works 2021)
3. Cathedral Strengthening and Reinstatement
4. Ancillary Buildings and Tower

vip_steel_glenelg_residential_project_momac_pics_6
vip_steel_glenelg_residential_project_momac_pics_6
vip_steel_glenelg_residential_project_momac_pics_5
vip_steel_glenelg_residential_project_momac_pics_5
vip_steel_glenelg_residential_project_momac_pics_4
vip_steel_glenelg_residential_project_momac_pics_4
vip_steel_glenelg_residential_project_momac_pics_3
vip_steel_glenelg_residential_project_momac_pics_3
vip_steel_glenelg_residential_project_momac_pics_2
vip_steel_glenelg_residential_project_momac_pics_2
vip_steel_glenelg_residential_project_momac_pics_1
vip_steel_glenelg_residential_project_momac_pics_1
Glenelg Spur

Check out the whopping 36.5 tonnes of structural steel in this massive residential home located at Glenelg Spur!

bg_cooke_construction_structural_steel_9-12-19_small_16
bg_cooke_construction_structural_steel_9-12-19_small_16
bg_cooke_construction_structural_steel_9-12-19_small_34
bg_cooke_construction_structural_steel_9-12-19_small_34
bg_cooke_construction_structural_steel_9-12-19_small_30
bg_cooke_construction_structural_steel_9-12-19_small_30
bg_cooke_construction_structural_steel_13-12-19_momac_small_51
bg_cooke_construction_structural_steel_13-12-19_momac_small_51
bg_cooke_construction_structural_steel_13-12-19_momac_small_31
bg_cooke_construction_structural_steel_13-12-19_momac_small_31
bg_cooke_construction_structural_steel_13-12-19_momac_small_28
bg_cooke_construction_structural_steel_13-12-19_momac_small_28
bg_cooke_construction_structural_steel_13-12-19_momac_small_11
bg_cooke_construction_structural_steel_13-12-19_momac_small_11
bg_cooke_construction_structural_steel_13-12-19_momac_small_4
bg_cooke_construction_structural_steel_13-12-19_momac_small_4
bg_cooke_construction_structural_steel_13-12-19_momac_small_42
bg_cooke_construction_structural_steel_13-12-19_momac_small_42
bg_cooke_construction_structural_steel_13-12-19_momac_small_44
bg_cooke_construction_structural_steel_13-12-19_momac_small_44
bg_cooke_construction_structural_steel_13-12-19_momac_small_40
bg_cooke_construction_structural_steel_13-12-19_momac_small_40
Waterloo Rd

Project Waterloo completed for BG Cooke Construction.  A 2020m² industrial factory including 252m² of attached office space.

vip_structural_steel_colombo_hotel_small_66-min
vip_structural_steel_colombo_hotel_small_66-min
vip_structural_steel_colombo_hotel_small_79-min
vip_structural_steel_colombo_hotel_small_79-min
vip_structural_steel_colombo_hotel_small_78-min
vip_structural_steel_colombo_hotel_small_78-min
vip_structural_steel_colombo_hotel_small_8-min
vip_structural_steel_colombo_hotel_small_8-min
vip_structural_steel_colombo_hotel_small_2-min
vip_structural_steel_colombo_hotel_small_2-min
vip_structural_steel_colombo_hotel_small_60-min
vip_structural_steel_colombo_hotel_small_60-min
vip_steel_colombo_st_delivery_small_1_62
vip_steel_colombo_st_delivery_small_1_62
vip_steel_colombo_st_delivery_small_1_56
vip_steel_colombo_st_delivery_small_1_56
vip_steel_colombo_st_delivery_small_1_54
vip_steel_colombo_st_delivery_small_1_54
vip_steel_colombo_st_delivery_small_1_48
vip_steel_colombo_st_delivery_small_1_48
vip_steel_colombo_st_delivery_small_1_46
vip_steel_colombo_st_delivery_small_1_46
vip_steel_colombo_st_delivery_small_1_36
vip_steel_colombo_st_delivery_small_1_36
vip_steel_colombo_st_delivery_small_1_17
vip_steel_colombo_st_delivery_small_1_17
vip_steel_colombo_st_delivery_small_1_12
vip_steel_colombo_st_delivery_small_1_12
vip_steel_colombo_st_delivery_small_1_4
vip_steel_colombo_st_delivery_small_1_4
Colombo St Hotel

Colombo St Hotel for Cook Brothers Construction

Because of this central city location and the length of these columns, we have to transport and complete the lifts at night. The longest column pictured is 25m long and weighs 17 tonnes! This will complete the 5th storey.

vip_steel_spec_6_airport_march_2020_small_33
vip_steel_spec_6_airport_march_2020_small_33
vip_steel_spec_6_airport_march_2020_small_30
vip_steel_spec_6_airport_march_2020_small_30
vip_steel_spec_6_airport_march_2020_small_18
vip_steel_spec_6_airport_march_2020_small_18
vip_steel_spec_6_airport_march_2020_small_50
vip_steel_spec_6_airport_march_2020_small_50
vip_steel_spec_6_airport_march_2020_small_45
vip_steel_spec_6_airport_march_2020_small_45
vip_steel_spec_6_airport_march_2020_small_41
vip_steel_spec_6_airport_march_2020_small_41
vip_steel_spec_6_airport_march_2020_small_13
vip_steel_spec_6_airport_march_2020_small_13
vip_steel_spec_6_airport_march_2020_small_4
vip_steel_spec_6_airport_march_2020_small_4
Spec 6 Airport

Spec 6 Warehouse at the Christchurch Airport Industrial Park.

Project Overview;

Client – Hanham & Philp Contractors

Total Steel Weight = 130 tonne
Warehouse Size = 120 X 60m
Dual Crane Roof Lift = 45 X 10m

vip_structural_steel_chch_boys_high_school_small_32
vip_structural_steel_chch_boys_high_school_small_32
vip_structural_steel_chch_boys_high_school_small_29
vip_structural_steel_chch_boys_high_school_small_29
vip_structural_steel_chch_boys_high_school_small_22
vip_structural_steel_chch_boys_high_school_small_22
vip_structural_steel_chch_boys_high_school_small_16
vip_structural_steel_chch_boys_high_school_small_16
vip_structural_steel_chch_boys_high_school_small_13
vip_structural_steel_chch_boys_high_school_small_13
vip_structural_steel_chch_boys_high_school_small_6
vip_structural_steel_chch_boys_high_school_small_6
vip_structural_steel_chch_boys_high_school_small_1
vip_structural_steel_chch_boys_high_school_small_1
Christchurch Boys High School

An iconic location and project for one of Christchurch’s oldest and most prestigious schools. It’s great to be working alongside Southbase Construction and providing all the structural steel for this project.

vip_steel_gold_pine_nelson_1
vip_steel_gold_pine_nelson_1
vip_steel_gold_pine_nelson_2
vip_steel_gold_pine_nelson_2
vip_steel_gold_pine_nelson_4
vip_steel_gold_pine_nelson_4
vip_steel_gold_pine_nelson_3
vip_steel_gold_pine_nelson_3
vip_steel_gold_pine_nelson_0
vip_steel_gold_pine_nelson_0
Gold Pine Nelson
New boiler house at Gold Pine Nelson.
vip_steel_windermere_0
vip_steel_windermere_0
vip_steel_windermere_1
vip_steel_windermere_1
vip_steel_windermere_2
vip_steel_windermere_2
vip_steel_windermere_3
vip_steel_windermere_3
vip_steel_windermere_4
vip_steel_windermere_4
vip_steel_windermere_5
vip_steel_windermere_5
vip_steel_windermere_6
vip_steel_windermere_6
vip_steel_windermere_7
vip_steel_windermere_7
vip_steel_windermere_8
vip_steel_windermere_8
vip_steel_windermere_9
vip_steel_windermere_9
vip_steel_windermere_10
vip_steel_windermere_10
vip_steel_windermere_11
vip_steel_windermere_11
vip_steel_windermere_12
vip_steel_windermere_12
vip_steel_windermere_13
vip_steel_windermere_13
vip_steel_windermere_14
vip_steel_windermere_14
vip_steel_windermere_15
vip_steel_windermere_15
Windermere Retirement Village
Project Windermere was completed in 4 stages with approx. 200t of structural steel going into this project.
vip_steel_FMG_0
vip_steel_FMG_0
vip_steel_FMG_1
vip_steel_FMG_1
vip_steel_FMG_2
vip_steel_FMG_2
vip_steel_FMG_3
vip_steel_FMG_3
vip_steel_FMG_4
vip_steel_FMG_4
vip_steel_FMG_5
vip_steel_FMG_5
FMG building

The new FMG building near Christchurch Airport.

DCIM101MEDIADJI_0386.JPG
DCIM101MEDIADJI_0386.JPG
DCIM101MEDIADJI_0381.JPG
DCIM101MEDIADJI_0381.JPG
DCIM101MEDIADJI_0377.JPG
DCIM101MEDIADJI_0377.JPG
vip_steel_avenger_cresent_5:9:19_web_34
vip_steel_avenger_cresent_5:9:19_web_34
vip_steel_avenger_cresent_5:9:19_web_28
vip_steel_avenger_cresent_5:9:19_web_28
vip_steel_avenger_cresent_5:9:19_web_23
vip_steel_avenger_cresent_5:9:19_web_23
vip_steel_avenger_cresent_5:9:19_web_13
vip_steel_avenger_cresent_5:9:19_web_13
vip_steel_avenger_cresent_5:9:19_web_18
vip_steel_avenger_cresent_5:9:19_web_18
vip_steel_avenger_cresent_5:9:19_web_12
vip_steel_avenger_cresent_5:9:19_web_12
vip_steel_avenger_cresent_5:9:19_web_1
vip_steel_avenger_cresent_5:9:19_web_1
vip_steel_avenger_cresent_5:9:19_web_4
vip_steel_avenger_cresent_5:9:19_web_4
Avenger Cresent, Christchurch

Commercial Structural Steel project at Avenger Cresent, Christchurch.

vip_steel_stairs_high_st_christchurch_11:7:19_web_63
vip_steel_stairs_high_st_christchurch_11:7:19_web_63
vip_steel_stairs_high_st_christchurch_11:7:19_web_57
vip_steel_stairs_high_st_christchurch_11:7:19_web_57
vip_steel_stairs_high_st_christchurch_11:7:19_web_55
vip_steel_stairs_high_st_christchurch_11:7:19_web_55
vip_steel_stairs_high_st_christchurch_11:7:19_web_43
vip_steel_stairs_high_st_christchurch_11:7:19_web_43
vip_steel_stairs_high_st_christchurch_11:7:19_web_47
vip_steel_stairs_high_st_christchurch_11:7:19_web_47
vip_steel_stairs_high_st_christchurch_11:7:19_web_37
vip_steel_stairs_high_st_christchurch_11:7:19_web_37
vip_steel_stairs_high_st_christchurch_11:7:19_web_33
vip_steel_stairs_high_st_christchurch_11:7:19_web_33
vip_steel_stairs_high_st_christchurch_11:7:19_web_28
vip_steel_stairs_high_st_christchurch_11:7:19_web_28
vip_steel_stairs_high_st_christchurch_11:7:19_web_24
vip_steel_stairs_high_st_christchurch_11:7:19_web_24
vip_steel_stairs_high_st_christchurch_11:7:19_web_10
vip_steel_stairs_high_st_christchurch_11:7:19_web_10
vip_steel_stairs_high_st_christchurch_11:7:19_web_5
vip_steel_stairs_high_st_christchurch_11:7:19_web_5
177 High Street, Christchurch Central City

In 2017 we completed all the structural steel for this heritage style building at 177 High St, Central City. One of our favourite features is the laser cut architectural stairway we built at our Bromley factory and had delivered to site and lifted into place as one unit! The building itself was completed stage by stage meaning as each floor was completed we completed a level of structural steel.

vip_steel_christchurch_prison_1-min
vip_steel_christchurch_prison_1-min
vip_steel_christchurch_prison_3-min
vip_steel_christchurch_prison_3-min
vip_steel_christchurch_prison_5-min
vip_steel_christchurch_prison_5-min
vip_steel_christchurch_prison_7-min
vip_steel_christchurch_prison_7-min
vip_steel_christchurch_prison_8-min
vip_steel_christchurch_prison_8-min
vip_steel_christchurch_prison_9-min
vip_steel_christchurch_prison_9-min
vip_steel_christchurch_prison_11-min
vip_steel_christchurch_prison_11-min
vip_steel_christchurch_prison_13-min
vip_steel_christchurch_prison_13-min
vip_steel_christchurch_prison_14-min
vip_steel_christchurch_prison_14-min
vip_steel_christchurch_prison_15-min
vip_steel_christchurch_prison_15-min
vip_steel_christchurch_prison_18-min
vip_steel_christchurch_prison_18-min
vip_steel_christchurch_prison_20-min
vip_steel_christchurch_prison_20-min
Prison Walkway & Structural Steel

Walkway & Structural Steel completed for corrections centre.

For more information on technical specifications – contact our team.

vip_frames_r&b_builders_silverstream_day1_small_5-min
vip_frames_r&b_builders_silverstream_day1_small_5-min
vip_frames_r&b_builders_silverstream_day1_small_3-min
vip_frames_r&b_builders_silverstream_day1_small_3-min
vip_frames_r&b_builders_silverstream_day1_small_10-min
vip_frames_r&b_builders_silverstream_day1_small_10-min
vip_frames_r&b_builders_silverstream_day1_small_12-min
vip_frames_r&b_builders_silverstream_day1_small_12-min
vip_frames_r&b_builders_silverstream_day1_small_1-min
vip_frames_r&b_builders_silverstream_day1_small_1-min
vip_frames_r&b_builders_silverstream_day2_small_2-min
vip_frames_r&b_builders_silverstream_day2_small_2-min
vip_frames_r&b_builders_silverstream_day2_small_3-min
vip_frames_r&b_builders_silverstream_day2_small_3-min
vip_frames_r&b_builders_silverstream_day2_small_27-min
vip_frames_r&b_builders_silverstream_day2_small_27-min
vip_frames_r&b_builders_silverstream_day2_small_33-min
vip_frames_r&b_builders_silverstream_day2_small_33-min
vip_frames_r&b_builders_silverstream_day2_small_40-min
vip_frames_r&b_builders_silverstream_day2_small_40-min
Silverstream – Residential Structural Steel

Architectural build being built by R&B Builders.

Project completed in Silverstream, North Canterbury.

In the photos you will see before and after pictures of the rafters being fixed to the steel.

Christ Church Cathedral Reinstatement Project 2022 (VIP Structural Steel)

2022 Structural Steel Highlight Video We're proud to be working on such an iconic project in the heart of Christchurch City - the Christ Church Cathedral Reinstatement! Special mention to the key project partners on this job – Christ Church Cathedral Reinstatement Limited, Naylor Love, and Holmes Consulting ------------------------------------------------------------------------------------------------------ VIP STEEL is a well established, locally owned and operated business specializing in the design, supply, fabrication and erection of structural steel for commercial and residential projects. The combination of friendly and professional service and the ability to work to tight deadlines has helped us build up a large customer base, including large commercial construction companies and well - known residential housing companies. With our large multiple workshops, yard spaces and through our team of experienced and dedicated staff, our clients can be assured that we have the capacity, skills and systems to take on any project. We are committed to providing you the highest quality products you expect and require. Website - www.vipsteel.co.nz Facebook - @vipsteel Ph - 0800 847 783 Musicbed SyncID: MB013TK8QXWPJTB

Rocking Horse Road Architectural Build - VIP Structural Steel

This is our project at Rocking Horse Road with T and A Construction, designed by Three Sixty Architecture and Ruamoko Solutions. This architectural new build has some really intricate design elements that are made possible through the use of structural steel. Have a listen to the very talented architect and homeowner Dean Cowell as describes his vision and technical challenges on this masterpiece. We were proud to be involved with the structural steel & metalwork on this project. Build details in the video. ----------------------------------------------------------------------------------------------------- VIP STEEL is a well established, locally owned and operated business specializing in the design, supply, fabrication and erection of structural steel for commercial and residential projects. The combination of friendly and professional service and the ability to work to tight deadlines has helped us build up a large customer base, including large commercial construction companies and well - known residential housing companies. With our large multiple workshops, yard spaces and through our team of experienced and dedicated staff, our clients can be assured that we have the capacity, skills and systems to take on any project. We are committed to providing you the highest quality products you expect and require. Website - www.vipsteel.co.nz Facebook - @vipsteel Ph - 0800 847 783 Musicbed SyncID: MB01LDJRQUUPU6Y
Load more...